Skip to content
10X

Selected Work

Systems in production.

Representative systems from real regional deployments. Every case here is described as accurately as confidentiality allows. When an outcome cannot be independently verified or publicly quantified, we describe the operational change instead of inventing a number.

Flagship caseBuilt by 10XDistribution & Wholesale

Regional AI Automation

Company profile — A regional distribution and wholesale operation in Southeast Asia, moving physical goods through marketplace and direct B2B orders. A lean operations team and no in-house software engineering.

Operational context

Order intake, supplier follow-up and reporting all ran through email, WhatsApp and individual memory. Two or three people were the system — when they were busy or away, orders stalled and nothing had a single status.

System architecture

  • An order-intake layer that consolidated orders from multiple channels into one queue
  • A purchase-order engine that drafted POs from intake data against supplier records
  • An AI-assisted triage step that classified and routed incoming messages
  • A supplier-notification flow with confirm/flag responses tracked back to the order
  • A single order-status view replacing scattered inboxes

Workflow sequence

  1. 01Order or enquiry arrives across channels
  2. 02AI triage classifies it and routes to the right queue
  3. 03System matches it against supplier records and drafts the purchase order
  4. 04A buyer reviews the draft and approves, adjusts or rejects it
  5. 05Approved PO and supplier notification are sent
  6. 06Supplier confirmation is captured and tracked against the order
Order queueRepresentative interface using synthetic data
OrderSourceStageStatus
ORD-4021Channel ADrafted POAwaiting approval
ORD-4022Channel BTriagedMatched to supplier
ORD-4023Channel APO sentConfirmed
ORD-4024Direct B2BNewIn triage

Constraints

No new headcount could be added, and the tooling had to be something the existing team could keep running without a dedicated engineer.

Human decision gate

Buyers approve every purchase order and supplier notification before it goes out — the agent drafts, it does not send.

Access & confidentiality

Access was scoped to the order-intake, purchase-order and supplier-messaging systems only, and revocable at any time.

What stayed under human control

Buyers retained sign-off on every purchase order and supplier notification. The agent and automation prepared and routed work; no commercial decision was sent without a person approving it.

Implementation approach

Processes were mapped and simplified before anything was automated — unnecessary steps were removed first. The build used proven workflow tooling the existing team could operate without a dedicated engineer, with human checkpoints designed in at every commercial decision.

Before

A regional distributor ran order intake, supplier follow-up and reporting through email, WhatsApp and memory. Every process routed through two or three specific people.

After

Reduced manual coordination, created a single order queue, and removed dependence on individual inboxes.

What the client owned afterward

The automation logic, the workflow configuration and the documentation were delivered to the business, built to be maintained by the existing team rather than creating a permanent dependence on 10X.

Outcome type

Efficiency & risk reduction

Built by 10XEcommerce & Marketplaces

Business Intelligence Platform

Problem — A multi-brand seller had a different version of every number in every meeting. Ratio metrics were recomputed differently in each report.

Built — A central data warehouse with a single daily KPI mart, metric logic computed once in SQL, and dashboards with drill-down by brand, channel and SKU.

Created one source of truth, standardised execution reviews, and improved operational visibility across markets.

Human decision gate — Metric definitions and calculation logic were signed off by the team that owns each number before the pipeline computed against them.

Explore Technology capability →
Managed by 10XConsumer Brands

Marketplace Growth Engine

Problem — Marketplace sales had plateaued. Campaign slots were missed, listings had decayed, and pricing drifted between channels.

Built — A cross-channel operating calendar covering campaigns, pricing rules and listing maintenance, with a monthly performance review against agreed numbers.

Standardised channel execution and restored a consistent campaign presence across marketplaces.

Human decision gate — Campaign and pricing moves were reviewed monthly against agreed numbers before the next cycle’s budget was set.

Explore Ecommerce capability →
Built by 10XRetail

Internal ERP Dashboard

Problem — Operational status — orders, stock, approvals — lived across disconnected tools. Managers spent mornings asking for updates.

Built — An internal dashboard aggregating orders, inventory and approvals into one live view with role-based access and an exception queue.

Improved operational visibility and shortened the daily coordination loop.

Human decision gate — The exception queue routes items needing a decision to a named owner; the dashboard surfaces status, it does not act on it.

Explore Technology capability →
Built by 10XManufacturing & OEM

Procurement Automation

Problem — Purchase orders were WhatsApp messages. Quantity mismatches between PO, invoice and delivery were discovered at payment time.

Built — A PO process with approval gates, supplier notification templates with confirm/flag actions, and three-way matching checkpoints.

Automated routine confirmations and created an auditable trail for every purchase.

Human decision gate — Every purchase order requires buyer sign-off before it is sent to a supplier; three-way matching flags exceptions for a person to resolve.

Explore Operations capability →
Built by 10XDistribution & Wholesale

Inventory Planning System

Problem — Reorders were placed by feel. Bestsellers stocked out while slow stock consumed warehouse space and cash.

Built — A planning model with reorder points, cover analysis per SKU, and action rules routing slow stock to clearance decisions.

Standardised reorder decisions and surfaced dead stock for action instead of storage.

Human decision gate — Reorder recommendations are reviewed by the planning team; clearance decisions on slow stock require sign-off, not automatic execution.

Explore Operations capability →
Managed by 10XConsumer Brands

Content Production Engine

Problem — Content happened in bursts around launches, then went silent. Each channel was fed manually with whatever existed.

Built — A content calendar and batch production pipeline covering photography, short video and localised variants, with a publishing cadence per channel.

Created a consistent publishing rhythm and an organised asset library owned by the brand.

Human decision gate — Brand review and approval happens before any asset enters the publishing calendar.

Explore Content Studio capability →
Managed by 10XEcommerce & Marketplaces

Regional Ecommerce Operations

Problem — Three markets ran three improvised versions of the same operation, with no comparable reporting and uneven fulfilment performance.

Built — One operating standard across Singapore, Malaysia and Thailand: shared SOPs, a unified channel calendar, and consolidated performance reporting.

Standardised execution across markets and made country performance directly comparable.

Human decision gate — Country leads sign off on local adaptations to the shared SOP before rollout in their market.

Explore Ecommerce capability →

Want the unabridged version of any of these, under NDA? Ask.

View contact status